Note: 03/26/24 PIPE IS GOOD, CUTS ARE MADE, CULVERT CLEAR, HOT PATCH COMPLETE. AT THE TIME OF THE INSPECTION ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED.
ROW - STORMWATER FINAL
03/26/2024
APPROVED - AS NOTED
TPOLACEK
Note: 03/26/24 SPOKE WITH MIKE ABOUT TIRE AND OLD CULVERT PIPE ON PROPERTY LINE. BUILDER WILL REMOVE DEBRIS TODAY. APPROVING AS NOTED.
U -UTILITY RESIDENTIAL FINAL
03/26/2024
FINAL APPROVED
JHARDING
Note: Inspector Notes from Inspection 9035No irrigation, no cross connections.
ELECTRIC - EARLY POWER
03/19/2024
APPROVED - AS NOTED
BTAYLOR
Note: 3/18/2024 - PREVIOUS INSPECTION NOTES3-18-241. Outside back outlet not safed off.3-19-241. Emailed FPL at 1:30.
ELECTRIC - EARLY POWER
03/18/2024
Disapproved - NO FEE
BTAYLOR
Note: 3-18-241. Outside back outlet not safed off.
ROW - FINAL SURVEY (OFFICE USE ONLY)
03/18/2024
APPROVED
TPOLACEK
Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
FIELD SURVEY
03/18/2024
APPROVED
TPOLACEK
Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
U-CROSS CONNECTION
03/15/2024
APPROVED - AS NOTED
JHARDING
Note: No irrigation, no cross connections.
ROW- PRE-APRON (PRE-POUR)
03/07/2024
APPROVED
PFLANAGAN
Note: IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT ELEVATIONS BEFORE POURING CONCRETE. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
INSULATION
02/15/2024
APPROVED
BTAYLOR
Note: 2/14/2024 - PREVIOUS INSPECTION NOTESInspector Notes from Inspection 2420Inspector Notes from Inspection 24671/30/24: Check at next inspection.You will need to have your silt fence barrier repaired & keep it maintained in original condition per FBC 3307.1 to avoid disapproved inspections with fee going forward. This must be complete prior to scheduling the next inspection.2-9-241. Front beedroom smoke alarm to close to fresh air supply 3' min. Check at insulation.2-14-241. Dining room window is not foamed.
INSULATION
02/14/2024
Disapproved - NO FEE
BTAYLOR
Note: Inspector Notes from Inspection 2420Inspector Notes from Inspection 24671/30/24: Check at next inspection.You will need to have your silt fence barrier repaired & keep it maintained in original condition per FBC 3307.1 to avoid disapproved inspections with fee going forward. This must be complete prior to scheduling the next inspection.2-9-241. Front beedroom smoke alarm to close to fresh air supply 3' min. Check at insulation.2-14-241. Dining room window is not foamed.
LATH/BRICK/ WATER BARRIER
02/14/2024
APPROVED
BTAYLOR
Note: Inspector Notes from Inspection 2420Inspector Notes from Inspection 24671/30/24: Check at next inspection.You will need to have your silt fence barrier repaired & keep it maintained in original condition per FBC 3307.1 to avoid disapproved inspections with fee going forward. This must be complete prior to scheduling the next inspection.2-9-241. Front beedroom smoke alarm to close to fresh air supply 3' min. Check at insulation.
GRAVITY SEWER TEST
02/14/2024
APPROVED - AS NOTED
MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
SEWER TIE IN
02/14/2024
APPROVED - AS NOTED
MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
ALL ROUGH
02/09/2024
APPROVED - AS NOTED
BTAYLOR
Note: Inspector Notes from Inspection 24671/30/24: Check at next inspection.You will need to have your silt fence barrier repaired & keep it maintained in original condition per FBC 3307.1 to avoid disapproved inspections with fee going forward. This must be complete prior to scheduling the next inspection.2-9-241. Front beedroom smoke alarm to close to fresh air supply 3' min. Check at insulation.
ROOF VALLEY & METAL
01/30/2024
APPROVED - AS NOTED
RSIMS
Note: 1/30/24: Check at next inspection.You will need to have your silt fence barrier repaired & keep it maintained in original condition per FBC 3307.1 to avoid disapproved inspections with fee going forward. This must be complete prior to scheduling the next inspection.
WALL SHEATHING
01/25/2024
APPROVED
BTAYLOR
ROOF SHEATHING / BRACES/TIES/DOWN CELL
01/25/2024
APPROVED
BTAYLOR
FOUND SURVEY APPROVED (OFFICE)
01/23/2024
APPROVED
AMOBLEY
TIE BEAM / LINTEL
01/18/2024
APPROVED
BTAYLOR
MONOLITHIC SLAB
01/11/2024
APPROVED
BTAYLOR
PLUMBING 1ST ROUGH UNDERGROUND
01/08/2024
APPROVED
MGIBSON
WATER METER INSTALLATION REQUEST
12/27/2023
APPROVED
BVITALE
WILDLIFE CHECK - ENVIRONMENTAL
10/19/2023
APPROVED
DRODRIGUEZ
Department
Status
Date In
Date Out
ENGIN1
COMPLETE
01/23/2024
01/23/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON
COMPLETE
01/23/2024
01/23/2024
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
SW1
COMPLETE
11/09/2023
11/20/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ENGIN1
COMPLETE
11/09/2023
11/09/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON
COMPLETE
11/09/2023
11/09/2023
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
SW1
HOLD
10/12/2023
10/18/2023
Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COMPLEASE READ NOTES FROM LAST REVIEW FOR CORRECTIONS
ZON
COMPLETE
10/12/2023
10/13/2023
Note: Released By: KATIE TAING - (386)986-3751 - KTAING@PALMCOASTGOV.COM
PLENV
COMPLETE
10/12/2023
10/19/2023
Note: Released By: DYLAN RODRIGUEZ - - DRODRIGUEZ@PALMCOASTGOV.COMStaff conducted a site visit on 10/19/23 and found no Gopher Tortoise or their burrows. Staff suggests placing silt fence as soon as possible to prevent tortoise from moving into the lot. If any gopher tortoises are located in the future further coordination may be necessary.
SWALE
COMPLETE
10/05/2023
11/28/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BLD
COMPLETE
10/04/2023
10/05/2023
Note: Released By: JPI
CUSVC
COMPLETE
10/04/2023
10/09/2023
Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM
ELEC
COMPLETE
10/04/2023
10/09/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1
COMPLETE
10/04/2023
10/05/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS
CANCEL
10/04/2023
10/09/2023
LOCATE
COMPLETE
10/04/2023
10/06/2023
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH
COMPLETE
10/04/2023
10/09/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1
HOLD
10/04/2023
10/05/2023
Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COMLot drainage features and patterns must be clearly depicted and include flow arrows.Land Development Code Technical Manual, Section 300.01 (A)(1)(C)(5)The front property line/right away elevation are to be equal to or greater than thecenterline of the road elevation.Land Development Code Technical Manual, Section 300, Drawing 300.D,
ZON
HOLD
10/04/2023
10/05/2023
Note: Held By: KATIE TAING - (386)986-3751 - KTAING@PALMCOASTGOV.COMThe rear of the house faces the ROW, therefore additional plantings are required.
BADMIN
COMPLETE
10/04/2023
10/09/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
Address: 747 Lubowitz Run, Sidmouth, HI 90646-5543
Phone: +99513241752844
Job: Design Supervisor
Hobby: Digital arts, Lacemaking, Air sports, Running, Scouting, Shooting, Puzzles
Introduction: My name is Delena Feil, I am a clean, splendid, calm, fancy, jolly, bright, faithful person who loves writing and wants to share my knowledge and understanding with you.
We notice you're using an ad blocker
Without advertising income, we can't keep making this site awesome for you.